building work in progress…

We’ve been very lucky: The roof has been replaced without a single drop of rain falling! And the chimney does NOT have to be torn down – although it looked all crumbly, actually it was still solid as a rock.

Today we are reclaiming the upstairs bed room. We didn’t think things through before the roofers came, didn’t realise just how much debris and glass wool would drop down on everything. We left all clothes rails uncovered and now we have to pay the price… I’m on the 4th wash, and it will take us a day of hoovering until we can safely enter the room without a mask on.

Meanwhile we’ve had a flurry of Airbnb bookings. Tonight we have a guest from Argentina. The kitchen and the bathroom have already been redecorated, so Santiago will get the benefit of a pristine environment.

Check out our Blue Salon, in case you need accommodation in Cardiff:

There is never a dull moment here :-)


Posted in Uncategorizedwith comments disabled.